Preassembly of a passenger lift in the Bielefeld factory
The lift is completely assembled before being transported to the site for installation.
The lift is loaded onto a flatbed truck
The lift is transported in one piece or in several sections.
Proposed location in a courtyard
The pit, constructed on site
For the installation of a HIRO 620 lift in Jena, a section of road was temporarily closed for the duration of the crane works.
Lying on the flatbed truck, the lift is made ready for hoisting into place with the crane.
The lift is hoisted from the flatbed truck.
Installation using a crane
The crane hoists the lift into the courtyard.
Lowering the lift
The lift is lowered into place.
Lowering into the pit
The second section of the lift has been lowered and mounted.
The HIRO 620 passenger lift, standing at its final location.